Cold weather comes to Atlanta
October 31, 2009
The weather has turned south in the Atlanta area in late October. Bike nights have come to a close and riders are storing their toys for the winter months. November through January is a great time to tear down and rebuild a classic, restore an old barn yard find, or even fix some pesky scratches on a road machine. Over TWO Customs is glad to help with all your paint, fabrication, customization, and restoration needs through the holiday seasons!
The O.T.C Custom Build – Kawasaki KZ 550
October 31, 2009
Overtwo Customs was given this 1982 Kawasaki KZ 550 back in late May, 2009.
The bike had been sitting outside a local mechanics shop for about 2 years. Rusted and abandoned OTC took the bike in and gave it another chance to hit the streets.
The 550 was stripped down to the frame and rebuilt to assess any mechanical issues then stripped down once again to begin the custom build.
Demons Cycle out of Pompano Beach, FL provided us with the custom gas tank for the build however the stock frame rail would not support the custom tank. The frame was then chopped and welded to support the addition of the chopper style tank addition. In addition to the center rail modification, the rear of the bike was also chopped and fitted with a Vulcan 750 cut rear fender.
All original tank support was removed from the upper frame rail and side case cover mounts were removed as well.
The frame and fork tubes were painted pearl white to accent the black motor and tins.
The wheels and miscellaneous mounting hardware is powdercoated chrome.
The bike was outfitted with a custom tail light, new tires, drag bars, custom spring supported seat from a GSXR 1000 and chrome tipped slash cut dual exhaust.
Total build time – 5 days.
Yamaha VStar Classic
October 10, 2009
This Yamaha Vstar arrived in great shape, bone stock,black and blue. OTC has outfitted this classic with a classic look of suede blue and pearl white with custom airbrush art, white braided brake lines, and custom seats.
Total build time – 3 weeks
Joel’s SV650s
October 3, 2009
Joels 650 came in in need of some TLC. The tank was severely dented, rashed plastics, and a few other cosmetics.
OTC went with a bright yellow and black with silver pinstripe to accent the clean lines of the bike.
Side fairings were also added to the bike.
Work completed -
New subframe – powdercoated
Brake calipers powdercoated
Dent removal and fairing repair
Custom paint
Frame slider install
Total build time – 9 days





![IMGP0003 [800x600] IMGP0003 [800x600]](http://overtwocustoms.overtwo.net/wp-content/uploads/IMGP0003-800x600-300x199.jpg)